FSDRILL / Article

Customer Case | Fast Drilling in Karst Limestone Formation – Guangxi Highway Bridge Project

danz43201@gmail.com

Customer Info
Mr. Tao Jigong, working on the Outer Ring Expressway project in Guilin, Guangxi.

Project Application
Advance drilling for bridge pile foundations in a karst area, known for complex and variable limestone formations.

Product Used
Fengsu 91# FS 4th-Generation Spiral Alloy Bit for Granite
(Designed for hard and abrasive rock layers, optimized for fast penetration and long service life.)

Ground Conditions
Limestone formation in a typical karst terrain, with fractured and variable rock structures that are often challenging for drilling equipment.

Performance Feedback
Mr. Tao reported impressive results:

Customer Review
Mr. Tao is highly satisfied with the durability and speed of the Fengsu bit. The bit performs well under high-speed drilling conditions and maintains excellent stability in complex formations.

Additional Info
Below is a video showing the actual drilling speed on-site, along with formation photos and geological information provided from the jobsite.